Skip to content
SFWMD Recreational Forum – June 17, 2019. the Kissimmee River Restoration Project, led us through a PowerPoint presentation outlining the efforts of South Florida Water Management District in restoring the Kissimmee River to its original condition. Kissimmee River Restoration. The Kissimmee River Restoration History The largest river restoration project in the world! Kissimmee River Restoration Project Progress (after) Looking north at the north section of the Reach 3 C-38 canal backfill, which was completed by the end of August and shortly after was inundated with high flows.
Neither happens to be true. Kissimmee River Restoration Update Monica Sovacool, Senior Project Manager. The U.S. Army Corps of Engineers, Jacksonville District, said in their latest announcement that the armoring of the Canal 37 (Kissimmee River) embankment between Lakes Hatchineha and Kissimmee … The Kissimmee River Restoration Project will help to clean up the dirty water problem that South Florida has been experiencing for many years.
Removing nutrients was not one of the main goals of the Kissimmee restoration, ... (Kissimmee) river and now they’re trying to get back to where it ... so it’s going to be an endless problem." PDF | On Jan 1, 2014, B. L. Jones and others published Kissimmee River Restoration and Basin Initiatives. As part of the Central and Southern Florida Flood Control Project, between 1962-71 the meandering Kissimmee River and flanking floodplain were channelized and thereby transformed into a 30 foot deep central drainage canal, compartmentalized … What is consistent with the facts though is the tradition of Florida water managers intentionally misrepresenting known facts to the public. Water levels have come down since October, and some erosion has occurred. Kissimmee River Restoration Update Project Overview Construction Update/Projected Timelines • Completed Work • Remaining Work
Questions and Answers Kissimmee River Restoration Project What was the condition of the Kissimmee River prior to the start of restoration efforts? This is one reason that the Kissimmee River restoration is considered to be the largest true ecosystem restoration project in the world, attracting ecologists from other states and countries. Restore the Kissimmee River. Between 1962 and 1971, the United States Army Corps of Engineers (USACE) channeled the Kissimmee River and created a 30-foot deep, 300-foot wide, 56 mile long drainage canal (C-38). The Kissimmee River Restoration Project is creating a more natural flow regime and floodplain inundation patterns, which may increase the retention of phosphorus within the restoration project area. This familiar but enduring problem arises from mismatches in language, conceptual frameworks, scales of operation, ... federally sponsored restoration projects such as those in the Grand Canyon or the Kissimmee River of Florida undergo rigorous review scientific peer review. He provided a narrative on the history of the project and spoke about metrics that were being used to evaluate its progress. Located in Florida's Heartland, the Kissimmee River historically meandered 103 miles from LakeKissimmee to Lake Okeechobee through a diversely rich 1-3 mile wide floodplain. A crucial undertaking generations in the making, the Kissimmee River Restoration Project is now within sight of the finish line, reports the South Florida Water Management District. [5] References ^ a b U.S. Geological Survey Geographic Names Information System: Kissimmee River ^ a b Hinnant, Lee. The Kissimmee River used to be a 103 mile meandering river that started north of Lake Okeechobee near Orlando. He provided a narrative on the history of the project and spoke about metrics that were being used to evaluate its progress. It also consists of about two dozen chain of lakes near the beginning of the river. The entire food chain benefitted.